Scheduled cleaning services for construction and renovation projects. From removing construction debris to the final fine clean, we work in step with the build process and finish with a verified handover.
Removal of debris, packaging, paint stains and splashes.
Every surface, from switches to door frames and radiators.
Glass, frames and casings — free of sticker, adhesive and paint residue.
Concrete, stone, parquet, tiles — machine cleaning suited to each type.
Taps, tiles, mirrors, silicone — free of limescale and grout residue.
Dusting in grilles and at height too.
Phased work following the project schedule.
Room-by-room photos, a handover report and a snagging list.
Business use cases. Every site has its own routine — we tailor the team, the checklist and the documentation to it.
For main contractors and subcontractors, for scheduled handovers.
Cleaning of clinics, care homes and institutions before handover.
Cleaning of halls, warehouses and office areas before handover.
Cleaning of renovated offices and retail units, ready for handover.
How we work
Every job follows the same transparent, step-by-step process, with a dedicated contact person.
We assess the area, the level of soiling and the handover deadline.
We split the work into phases, aligned with the contractor's schedule.
Rough, then fine cleaning, with industrial machines.
Photo-documented report, defect list and rework where needed.
How to order
Video
Coarse dust, paint marks, machine floor cleaning and windows — the video shows the workflow of a real post-construction cleaning job, with our own team and our own machines.
At the end of a project, the cleaners are the last team on site. If they slip, the handover slips too — and the client only discovers at the key handover that the work isn't finished.
Post-construction and post-renovation cleaning
It will not come off without the right product and a method that causes no damage.
Air conditioning, switches, door frames, floor corners — a superficial clean is not enough here.
The client asks for evidence: photos, a report, a snag list.
From our real projects
Photos taken by our own team during post-construction cleaning and after handover, unretouched.
Post-construction and post-renovation cleaning
The cleaning does not end when we leave the site.
Tasks, inspections and completed work can all be tracked in a single, in-house system. That makes the work transparent, documented and traceable.
This is how Clenux One works in practice.
Clenux OneWe walk through the site, assess your needs and send an itemised, fixed quote with no hidden charges.
Case study
Guide
Available headcount
80+ staff
Our own trained team
Trained and formally employed; with a fixed team on regular contracts.
Liability insurance
5M Ft
Safety on every job
Settling any damage is never left to the client.
Industry
11
Industry-specific methods
From hotels to construction, always with a site-specific checklist.